<h2>The checklist</h2>
<pre>
+3.5.8.0 Xyz XY
+
+ - It is no longer necessary to keep a log of changes to the upstream
+ sources in the copyright file. Instead, all such changes should be
+ documented in the changelog file. [13.7]
+
3.5.7.0 Aug 02
- Packages no longer have to ask permission to call MAKEDEV in